(110V 60HZ) BYC600 tablet coating machine /pill coating machine/ tablet coating system, suitable for most of coating material
Note:
1.There are both 110V 60HZ and 220V 50HZ for BYC-600 series tablet/pill coating machine, pleases kindly let me know what’s voltage in your workplace.
2.The BYC-600 series tablet coating machine is sent by DHL and FedEx by default from China. Please kindly let me know which shipment is convenience for you. Maybe you can contact with us for better shipping cost.
Main Technical Parameters
Model |
BYC-300 |
BYC-400 |
BYC-600 |
Dia. Of Pot |
300mm |
400mm |
600mm |
Rotational Speed |
46r/min |
46r/min |
40r/min |
Motor Power |
0.37kw |
0.55kw |
0.55kw |
Heating Wire Power |
500w |
500w |
800w |
Blower Power |
40w |
40w |
60w |
Capacity |
2kg/h |
5kg/h |
15kg/h |
Weight |
65kg |
70kg |
120kg |
Overall Size |
485*585*765mm |
485*585*810mm |
700*540*1300mm |
External heating power |
500w |
500w |
600w |
Installation
1. Connect to the power. Take care not to choose the wrong wires.
2. Check the tube is properly connected to the bottom of the pot.
3. Add liquid coating solution to the barrel.
4. Turn on power switch.
5. Follow the instructions for regulating the speed.
6. Turn on the inlet adjustment switch for the fan to work.
7. Set the air temperature control by turning the dial in the center. If the actual temperature isbelow the value set, the heater will start automatically. If the actual temperature is higher than the value set, the heater will disconnect.
8. Turn on the gun switch. If the spray gun works, refer to the instructions for using the spray gun.
9. If all the above is in order, open the air compressor to air pressure of about 5 ~ 7kg/cm3.
Maintenance:
1. The deceleration box lubricants and bearing grease cavity should be changed regularly (generally, every six months).
2. If the coating pan has not been in use for a long period, the surface should be oiled.
3. The spray should be cleaned by water after each shift to avoid blocking. If blockage occurs, refer to the instructions for demolition of the spray, and remove residue with a fine needle.
4. The temperature of the worm gear should not exceed 50 when it is running.
5. The oil seal worm shaft ends should be replaced every six months.
6. The machine must be grounded; its grounding resistance should be ≤ 4Ω.
7. Appliances should not be relocated arbitrarily
Warranty:
1. The powder mixing machine BYC-600 series tablet coating machine is designed with high stainless steel quality constructions and meet GMP standard.
12 months limited warranty for defective items (excluding items damaged and/or misused after receipt). Accessories come with a 3 months warranty.
2. Defective items must be reported and returned within the warranty period and in the original packaging, if possible. You must tell us what the defect is and give us your order number.
3. It is buyer’s responsibility to pay for return postage and ship the item back to us. We will send it back if the machine is defective as report.
4.If the machine were damaged during delivery, customers should inform us at once and email us photo of the damaged part. After checking, we may send a new part for free.
5. For following situations, the item is out of free warranty
(1). Damaged caused by: misused, improper installation and so on man-made fault.
(2). Warranty seal removed or damaged.
6. Lifetime service. Please kindly let me know if you have any question about the machine or there are other machines meet your requirement. We will do our best to help you.
Payment:
Any payment is accepted if it is more convenience for you.
Feedback:
We will very appreciate that if you can kindly give 5-star positive feedback, It’s good for our long term business .We will also provide the same feedback to you. Please kindly contact with us before you give us neutral or negative feedback if there are something make you upset, we will do our best to help you.
0 out of 5 (0 Ratings)
Positive (0%) |
5 Stars (0)
|
4 Stars (0)
|
|
Neutral (0%) |
3 Stars (0)
|
Neutral (0%) |
2 Stars (0)
|
1 Star (0)
|
Name | Rating | Feedback |
---|
Shipping Company | Shipping Cost | Estimated Delivery Time |
---|---|---|
3 - 7 days | ||
3 - 7 days | ||
5 - 14 days | ||
Post Air Mail | Free Shipping | 15 - 45 days |
Return Policy | If the product you receive is not as described or low quality, the seller promises that you may return it before order completion (when you click "Confirm Order Received" or exceed confirmation timeframe) and receive a full refund. The return shipping fee will be paid by you. Or, you can choose to keep the product and agree the refund amount directly with the seller. N.B.: If the seller provides the "Longer Protection" service on this product, you may ask for refund up to 15 days after order completion. |
---|---|
Seller Service | On-time DeliveryIf you do not receive your purchase within 60 days, you can ask for a full refund before order completion (when you click "Confirm Order Received" or exceed confirmation timeframe). |
Most Popular from Category
7KW (R22) air source heat pump condenser
110v flat pan fry ice cream machine price,single pot ice fryer machine Ship by air to airport
UDDT-12 wafer cup maker ice cream cone making machine
SHIPULE 2017 commercial rice stone removing machine , electric rice destoning machine , rice processing machine
SHIPULE stainless steel automatic electric orange juicer commercial used orange juice extractor machine
56L Electric 2 Tanks Fryer 4 Baskets Vertical double cylinder double screen electric deep fryer maker machine
online shopping, buying directly from manufacturers?
- Go to Alibaba.com and enter the wanted item into search field.
- Having made your choice, click "Contact supplier" button on the right
- On the next page enter your request and click "Send" button.
- Upon clicking you will be asked to get registered. Do it and wait for the reply.